EC State Aid Guidelines Bias in Favor of Big Conventional Utilities?

Image
My speech at PowerGen 2015 in Amsterdam has gotten some substantial press  here and here. My thesis is that the large conventional utilities prevailed on the Commission to restrict renewable and distributed energy in important ways that favor their interests. This includes the requirement that everything above 500 kW be connected to the grid (restricting distributed energy on many types). The requirement that every project over 1 MW compete in an auction, where large utilities have shown historical dominance and market power (replacing guaranteed support systems that have nurtured a decentralized power model in Europe). And finally an incomprehensible provision that takes away the renewable energy classification for green energy that is stored and used later (potentially devastating to efforts to encourage the critical development of energy storage in Europe). The auction system is proven to be a "box of lose gears" that does not produce a predictable amount of renewa...

More Unintended Consequences from the Auction Scheme

Image
Some really bad things will start to happen as the auction in Poland for renewable energy support gets closer. Despite the long discussion over the new law and the guidelines from Brussels (which were relatively rushed through without full consideration of their consequences), there are some real problems looming. First, the auctions to be competitive under EC policy should have at least as many losers as winners. This allegedly allows for competition in the bids for support. The reality is that the small auction (below 1 MW) will have much larger support offered than will be covered by bids. There will be no serious competition and the reference prices will set the limits. That, of course, could be done without an auction and would achieve a much higher rate of quality projects. But the large auction (over 1 MW) is likely to have many more bids than awards. Thus, the EC rule of thumb of 50% losers may occur. That means that 50% of the projects ready to go in Poland will not procee...